Welcome to Foshan Shike Glass Technology Co., Ltd.

热久久免费视频-热久久免费-热久久久久久-热久久久-热久久精品在线-热久久国产欧美一区二区精品

Steel furnace operation knowledge and precautions
2018-07-12
Steel furnace operation knowledge and precautions
 
First, preparation before warming up:
 
1. Check if each solid state relay is connected virtually;
 
2. Check if the parameter settings on the touch screen are correct.
 
3. Whether the connection between the front and rear furnace doors and the drive shaft is normal;
 
4. Is the photoelectricity of the upper and lower stations normal?
 
5. Whether the furnace body and the transmission O-ring of the wind grid are normal;
 
6. Whether the furnace body and the encoder of the wind grid are normal (visual inspection);
 
7. Is the voltage of the battery normal?
 
8. Is the air compressor normal?
 
9. Whether the upper air switch of the solid state relay is closed;
 
10. Go through the empty process and watch the touch screen for alarm status;
 
11. Start heating up after normal, and use matrix heating to raise the temperature to avoid full heating.
 
Second, the precautions before running the tempering furnace:
 
1. When the system is running, you will hear the venting sound of the rear door solenoid valve twice, and the rear door will perform the opening and closing actions once, otherwise it is not normal;
 
2. Check if the touch screen has an alarm status and follow the prompts to solve it;
 
3. Cover the photoelectric switch of the upper stage with your hand and take a glass of glass to see if it is normal. Note that when the glass is released, the rear door will perform an opening and closing action. After that, the alarm will sound and the rear door will open. The glass is baked; normal production is observed after normal operation, and the production is in a fully heated state;
 
Third, the touch screen parameter settings:
 
1. Temperature setting: For 4, 5, 6 mm glass, the upper furnace set temperature is 710 degrees, the lower furnace set temperature is 700 degrees; for 8, 10 mm glass, the upper furnace set temperature 700 degrees, the lower furnace set temperature is 690 degrees; for 12,15,19 mm glass, the upper furnace set temperature is 690 degrees, the lower furnace set temperature is 680 degrees;
 
2. Setting of tempering and cooling air pressure: For 4, 5, 6 mm glass, the tempered wind pressure takes a large value, the blowing time is “conversion time”, the cooling time is small, and the blowing time is the total blowing time minus "conversion time";
 
3. Stepping into the film: the stepping value of the film is 3 seconds, which is a fixed value. It does not need to be changed, which is the number of seconds the inverter is rotating.
 
Fourth, other notes:
 
1. The DC protection button of the console must be pressed in unison to keep the circuit connected, otherwise the DC protection will not work after power failure;
 
2. When there is a power outage during production, press the “DC Strip” button on the windshield operation panel for the first time, and let the glass in the furnace drain to the lower platform to the ground;
 
3. When the glass in the furnace breaks during production, you must press the “furnace failure” button for the first time. The action at this time is: the rear furnace door is opened, the furnace body, the wind grid, and the lower table roller are rotating forward to make the glass Discharge to the ground; press the furnace fault button to reset it after completion. Note that when you enter the furnace again, you must press the system to stop at the touch screen, and then press the system again before you can produce normally. Otherwise, Can't enter the glass;
 
4. When the windshield breaks, the glass must be broken. You must press the “window fault” button. At this time, the windshield roller stop stops. If the glass of the windshield is not desired, press the “window fault” button again. The damper is closed to stop the blowing, and the action at this time is that the wind dam is advanced in advance, and then the damper is pressed to cause the glass on the wind slab to fall;
 
5. Note: The windshield debris must be disposed of properly after production.
CONTACT US

TEL:13812633032(同微信) 17503077662(whatsapp)

FAX:0757-81992352

EAMIL: [email protected]

No. 5, Jingang Avenue, Baini Town, Sanshui District, Foshan City, Guangdong Province

主站蜘蛛池模板: 精品国产一区在线观看 | 日韩欧美综合视频 | 欧美日韩亚洲综合久久久 | 一级毛片一级毛片一级毛片 | 亚洲视频99 | 69天堂网在线视频精品 | 亚洲欧美在线综合一区二区三区 | 欧美插入视频 | 日韩高清网站 | 国产日韩欧美精品在线 | 亚洲欧洲一级 | 中文japanese在线播放 | 天天干天天操天天做 | 国产精品专区第二 | 国产天美freesexvideos中国 | 久久精品视频在线观看 | 91精品国产综合久久精品 | 亚洲欧美日韩在线一区 | 国产美女精品视频免费观看 | 中文字幕日本一级高清片 | 国产高清三级 | 成年女人永久免费观看片 | 色黄网站aaaaaa级毛片 | 免费欧洲毛片a级视频 | 手机在线观看a | 成年人黄色网址 | 国产日韩亚洲不卡高清在线观看 | 日本a一级毛片免费观看 | 黄色一级α片 | 成人精品免费网站 | 四虎久久 | 久久99精品久久久久子伦 | 一级做片爱性视频免费 | 岛国精品在线 | 嫩草成人影院 | 国产综合视频在线观看一区 | 日本三级视频网站 | 亚洲欧洲日韩国产一区二区三区 | 久草青草 | 美女视频久久 | 国产美女又黄又爽又色视频免费 |